Langkau ke kandungan

Technical buyer guide

Senarai Semak Lukisan Aci Cacing untuk RFQ

A drawing can shorten quotation time only when it connects the worm geometry, shaft datums and end interfaces. This checklist shows what to mark before sending the RFQ.

Senarai Semak Lukisan Aci Cacing untuk RFQ

Why this question matters

For a buyer, worm shaft drawing checklist matters because it changes the information that belongs on the drawing, inspection plan or RFQ. The checks below turn the topic into purchasing decisions instead of leaving it as background theory.

Decision point

Identity and revision

Put the part number, drawing revision, units, general tolerances and quantity on the document.

Identity and revision

Decision point

Data cacing

Add module or diametral pitch, pressure angle, starts, hand, lead/lead angle or the complete profile definition required by your design. Include the mating wheel or its tooth count/center distance where applicable.

Data cacing

Shaft data

Dimension the overall length, threaded face, journals and fits, shoulders, keyways, splines, end threads, holes and reference datums.

Material / process

State controlled material, heat treatment, hardness/depth, finish and inspection notes instead of relying on generic supplier defaults.

RFQ fields to carry forward

Parameter Spesifikasi / panduan
Part reference Drawing/sample/model and revision.
Worm geometry Module/pitch, starts, hand, lead/lead angle, pressure angle when known.
Mating wheel Tooth count/material/center distance or complete assembly reference.
Antaramuka Journals, shoulders and end features.
Kewajipan Speed, load, duty, lubrication, environment.
Pesanan Quantity, inspection/documents, target date and destination.

Soalan lazim

Can I leave unknown values blank?

Yes. Mark them as unknown and attach the part/wheel or application context. A blank item is safer than a guessed technical value.

Does the website product table replace my drawing?

No. Product tables organize confirmed series context and RFQ requirements. The approved drawing or order specification controls custom geometry.

Can I order samples first?

For a worm shaft drawing checklist project, 1–5 samples can be considered where the manufacturing route is suitable. A very small 1–2 piece order is also possible, normally at a higher unit cost.

Practical check

Put critical data where it cannot be separated from the part revision

A note in an email can be lost on a repeat order. Put stable worm geometry, shaft interfaces, material and critical inspection requirements on the controlled drawing or an explicitly referenced specification, then use the RFQ for quantity, timing and commercial details.

Treat the rows below as a document-location check: stable geometry belongs with the controlled part definition, while order-specific quantity and delivery information belongs in the RFQ. Keeping those roles clear makes repeat orders easier to control.

Put critical data where it cannot be separated from the part revision

Working check

Situation What to verify
Drawing Stable geometry, datums, interfaces, material/process references.
Referenced specification Detailed treatment, inspection or customer requirements that are too large for the print.
RFQ Quantity, application, target date, destination and documents needed for this order.
Sample/photos Evidence for replacement work when a complete drawing does not yet exist.

Petikan daripada antara muka sebenar

Minta Sebut Harga / Hantar RFQ

Hantar rujukan model atau lukisan, kuantiti, aplikasi dan geometri yang mengawal padanan dan jaringan. Nilai yang tidak diketahui boleh dikenal pasti untuk pengesahan dan bukannya meneka.

Panduan komersial. MOQ adalah fleksibel mengikut jenis produk dan jumlah nilai pesanan. Jika sesuai, pembeli baharu boleh meminta 1–5 sampel; pesanan model campuran disokong sekitar USD 1,500 digabungkan. Pesanan 1–2 keping boleh dilakukan pada kos seunit yang agak tinggi. Item standard biasanya memerlukan 10–25 hari bekerja, komponen tersuai 20–45 dan peralatan projek 45–120. EXW, FOB, CIF dan DAP biasanya disokong; FCA, CFR, CPT, CIP dan DDP boleh dirunding.